Fosterville Gold Mine Case Study
Agnico Eagle Fosterville Gold Mine (Fosterville) operates a gold plant in Australia comprising of a crushing and grinding circuit (SAG mill with a closed loop cyclone classification circuit) followed by flotation, bacterial oxidation and leaching circuits. The lack of surge capacity between the grinding and flotation circuit and restrictions on crushing operations due to noise constraints resulted in unique set of challenges, that required the implementation of a novel control solution using advanced instrumentation.
Please register to access this download.